BUSINESS
ENERGYEN manufactured equipment totaling $1,000,000,000+ since inception,
upholding a tradition of quality and reliability in plant equipment manufacturing.
BUSINESS
Gland Steam Condenser

Introduction

The gland steam condenser packages create a slight vacuum on the turbine shaft seals using vacuum pumps and centrifugal blowers. The equipment captures the mixture of leaked steam and air, where the two are separated. The resulting condensate in a shell and tube condenser then drains from the bottom, while the air is extracted from the top.

ENERGYEN leads with advanced technology and competitive strengths in both the basic and detailed design of gland steam condensers, which are installed in thermal and nuclear power plants, both domestically and internationally. Furthermore, ENERGYEN conducts comprehensive vibration, stress, and fatigue analyses to ensure enhanced product quality and client confidence.

ENERGYEN boasts extensive experience with major codes and standards such as ASME, TEMA, and JIS, as well as with local regulations around the world, including PED (Europe), DOSH (Malaysia), METI (Japan), and CSA (Canada).